Our technicians and engineers have 23 several years of Encounter in the Bearing Sector.
Materials |
one. metallic:Aluminum/Metal/Alloy metal/Stainless steel/Brass,copper,bronze etc. 2. plastic: Abs,POM,PE,PP,PVC,Computer,PMMA,Teflon,nylon etc. three. other people: carbon fiber, glass,fiberglass, wooden, tough rubber and so forth. |
Shade |
Silver, Gray, Black ,Gold or as client’s requirement |
Floor Roughness |
Ra0.8 ( without sharpening or grinding) |
Logo Technique |
laser engraving, CNC engraving, monitor-printing etEPG Machinery is positioned in XiHu Location HangZhou Zhejiang ,China. It is 30km from our factory to HangZhou worldwide airport. c. |
Surface Finish |
Anodize polishing zinc/nickel/chrome/gold plating, sand blasting, ect. |
Tolerance |
+/- .01–.05mm / can also be personalized |
Certification |
ISO SEPG |
Processing equipments |
CNC machining centre,NC lathe, Grinding machine, Computerized lathe equipment, Traditional lathe device,Milling equipment,Drilling machine,EDM,Wire-reducing device,CNC bending device and so forth |
Testing machine |
Coordinate measuring device,Impression measuring instrument,Caliper etc |
Software |
Medical Devices/Electronic/ Industrial// Automation / motorcycle/3D printer |
Support |
OEM,ODM or as client’s necessity |
Packaging & Delivery
Packaging Particulars
one. interior packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag etc.
two. outer packaging: carton box, picket case, plate and many others.
3. as per customers’ prerequisite
Port
xiamen, or as client’s need
Lead Time :
Amount(Pieces) | 1 – 20 | 21 – 100 | one zero one – 1000 | >1000 |
Est. Time(days) | 5 | 10 | 25 | To be negotiated |
Trade Phrases | FOB, CIF, EXW |
MOQ | 1Pcs |
Port | xiamen, or as client’s need |
Transport | By air (DHL,UPS,Fedex,EMS etc.),By Sea,Specific… |
Payment Approach | T/T(bank transfer),L/C,paypal,western union, moneygram,escrow, cash and so forth |
Payment Terms | fifty% before generation, 50% ahead of shipping |
Packing | internal box,numerous packing containers/learn carton or as customer’s necessity |
Delivery time | 5-7days for Alanple time,5-25 days for manufacturing |